Skip to content
ThermiQ
Quote

Building engineering practice - Paris region

Your copropriété obligations, finally clear.

Diagnostic technique global, plan pluriannuel de travaux, DPE collectif, statutory energy audits. We produce the reports your assemblée générale has to vote on, and we explain them to you.

Audit énergétique Bâtiments

Qualified RGE by AFNOR Certification for energy audits of buildings.

Certificate no. 119148.1

What the law requires

A copropriété carries obligations. Few syndics know which ones apply to their building.

Diagnostic technique global, plan pluriannuel de travaux, DPE collectif: three separate obligations, three timetables, three deliverables. We start by telling you which ones concern you, before selling you anything.

DTG

Diagnostic Technique Global

The full state of health of your copropriété, in a single document.

4 to 8 weeks depending on the size of the copropriété

PPT

Plan Pluriannuel de Travaux

Ten years of works, planned and budgeted, with no unpleasant surprises.

4 to 8 weeks, often carried out together with the DTG

DPE collectif

DPE collectif

The energy performance of the whole building, not of a single lot.

3 to 6 weeks

Audit énergétique

Audit énergétique

Carried out under AFAQ RGE qualification, so that it can be relied on and is eligible for funding.

4 to 10 weeks depending on the scope

PEMD

Diagnostic PEMD

Produits, Équipements, Matériaux et Déchets (products, equipment, materials and waste): what becomes of the building when it is demolished.

3 to 6 weeks

How it works

Four stages, and you carry none of them alone.

  1. 01

    We talk

    A twenty-minute conversation is enough to scope the work: your obligation, the size of the copropriété, and the date of your assemblée générale.

  2. 02

    We visit

    A survey of the building, the common parts and the plant. Measurements, photographs, readings. We obtain the documents from the syndic ourselves.

  3. 03

    We write

    A report written to be understood by a conseil syndical, not only by an engineer. Every finding is sourced and the works are set in order of priority.

  4. 04

    We present

    We will come and explain the report at your assemblée générale if you wish. That is often where the vote on works is decided.

An assemblée générale coming up?

Tell us your date. We will tell you plainly whether it is achievable, and what needs to start first.